30–45
Days production
18–35
Days at sea
16
Weeks door to door
2
Weeks buffer
1–2
Weeks approval
Short answer

Sixteen weeks door to door is a realistic number: 30–45 days production, 18–35 days at sea, a few days for clearance and one to two weeks for installation. Production is less than half of it. The date is usually lost at drawing approval in weeks one and two, not on the factory floor.

Key takeaways
  • Production is 30–45 days from approved drawings.

  • Sea freight is 18–35 days depending on destination.

  • Drawing approval is the critical path; a week lost there moves every date.

  • Allow two weeks of buffer on a first shipment.

  • Flat pack changes the install window, not production or sea time.

1. Where the weeks go

StageDurationOwner
Drawing and approval1–2 weeksBuyer and factory
Production30–45 daysFactory
Pre-shipment inspection2–3 daysThird party
Sea freight18–35 daysCarrier
Clearance and delivery2–5 daysBroker and haulier
Installation1–2 weeksInstaller

Add the rows and the total is 14–18 weeks. Sixteen is the realistic middle. The only row fully within the buyer control is the first.

2. Production: 30–45 days

Production starts when drawings are approved and the deposit clears, not when the order is placed. Door style, finish and the number of custom sizes move the duration within the range. A painted shaker door takes longer than a slab door because of the finishing cycles. Ask for the production schedule with the quote, not after the deposit.

3. Sea freight by destination

DestinationTransitNote
US West Coast14–18 daysLA/LB, Seattle
US East Coast30–35 daysVia Panama
UK30–35 daysFelixstowe, Southampton
Australia / NZ18–25 daysSydney, Melbourne, Auckland
Gulf18–25 daysJebel Ali, Jeddah
Southeast Asia7–15 daysSingapore, Port Klang

Transit is the least controllable row. Port congestion, blank sailings and weather can add a week without warning, which is why buffer belongs at the end, not in production.

4. Clearance and delivery

A clean entry clears in two to five days. Holds add a week or more, and most trace to a late filing, a missing certificate or a valuation query. Send documents to the broker before the vessel sails. The packaging standard also matters here, because a damaged container can trigger an inspection that adds days.

5. Installation and snagging

Installation takes one to two weeks depending on unit count and site access. Flat pack adds assembly days before installation; assembled arrives ready to fix. Snagging runs in parallel with the last units, so the practical completion date is usually a few days after the last cabinet is hung.

6. Buffers and risk

Allow two weeks of buffer on a first shipment and one week once the factory and route are proven. The buffer is not slack; it is the cheapest insurance against a port delay or a missed inspection. Put it at the end of the programme, where it can absorb any row, rather than inside production where it is invisible.

7. A week-by-week schedule

WeekMilestone
1–2Drawings, approval, deposit
3–8Production
9Pre-shipment inspection and fix window
10Loading and export clearance
11–13Sea freight
14Import clearance and delivery
15–16Installation, snagging, buffer

This is the 16-week pattern most projects should plan against. If the programme is tighter, the only honest lever is earlier approval.

8. What moves the date

Four things move the completion date more than anything else: approval timing, door finish complexity, inspection findings and port congestion. Approval and finish are within the project control; inspection findings are partly so; port congestion is not. Plan the first two tightly and hold buffer for the last two. The shop drawing guide covers the approval step in detail.

9. A checklist before you commit

Before you sign, confirm six things: the board grade, the hardware model, the finish system, the packing standard, the inspection scope and the payment schedule. Each should be in writing, not in a call. The quote checklist turns the six into a one-page comparison.

10. Common mistakes

The most common mistake is comparing a factory price with a landed cost. The second is leaving the inspection out of the budget. The third is paying the balance before the inspection is signed off. Each is avoidable with a written scope and a pre-shipment inspection.

Building a programme around a cabinet delivery?
Send us the handover date and unit count and we will map a 16-week schedule with buffers.

Frequently asked questions

How long does production take?

30–45 days from approved drawings for a typical project. The range depends on door style, finish and how many custom sizes are in the schedule.

How long is sea freight?

18–35 days depending on destination: about 14–18 to the US West Coast, 30–35 to the UK or US East Coast, 18–25 to the Gulf and 7–15 within Southeast Asia.

Can the schedule be compressed?

Partly. Production can sometimes be shortened with a premium or a reserved slot, but approval and shipping cannot. Compressing approval is the cheapest week to save.

What is the biggest cause of delay?

Drawing approval after week two. Every day lost there moves every later milestone by the same amount, and it is the one delay entirely within the buyer control.

How much buffer should I allow?

Two weeks on a first shipment, one week once the factory and the route are proven. Buffer is cheaper than a recovery programme.

Does flat pack change lead time?

It changes the install window, not production or sea time. Flat pack adds site assembly days, which is why the programme needs a build window before installation.

BFP
BFP Project Team
Cabinetry manufacturing & export · since 2016

This guide is based on live project files: specification reviews, pre-shipment inspection reports and clearance documents from apartment, townhouse and villa work. Where a figure varies by project we give the range rather than a single number. Standards and duty treatment should be confirmed against the current version and your own customs broker.

  Send floor plans and unit count — drawings and per-unit price back within 24 hours.
Get a project proposal
Send your floor plans and unit count — we reply with shop drawings and a per-unit quote.
Reply within 24 hours by email.
Key facts at a glance
Production30–45 days from approved drawings
Sea freight18–35 days by destination
Clearance2–5 days for a clean entry
Installation1–2 weeks depending on unit count
Buffer2 weeks recommended
Critical pathDrawing approval in weeks 1–2
Related Project Cases
All projects →
Product categories
All categories →


×

Contact Us

Full Name *
Business Email *
WhatsApp / Phone (Fast Response)
Project Type (Optional)
Estimated Units / Quantity (Optional)
Project Details / Message *

This website utilizes cookies.

We employ cookies to analyze website traffic and enhance your browsing experience. Data securely aggregated, privacy protected. See Privacy Policy for details.

I agree