Short answer

An apartment cabinet specification is a one-page document that fixes ten things: scope, board, finish, hardware, doors, benchtop, compliance, packing, inspection and payment. Write it before the quote. Without it, two factories quote different products and the prices cannot be compared.

Key takeaways
  • One page, ten clauses, each measurable.

  • Name the board grade, not just the standard.

  • Name hardware or an approved equal with published ratings.

  • Every clause should be checkable at inspection.

  • Write it before the quote, not after.

1. Scope

State what is included: kitchen, wardrobe, vanity, laundry, and any loose furniture. State what is excluded: benchtop, splashback, appliances, installation. Ambiguity here is the most common cause of a quote that looks low and lands high.

2. The ten clauses

#ClauseRequirement
1ScopeRooms and items included and excluded
2BoardCARB P2 or E0, 18 mm, HMR in wet areas
3FinishLacquer or melamine, sheen and colour
4HardwareNamed brand or approved equal, cycle rating
5DoorsStyle, thickness, edge banding
6BenchtopQuartz or laminate, edge profile
7ComplianceStandards, certificates, labelling
8PackingExport standard, carton, label
9InspectionScope, timing, acceptance
10PaymentDeposit, balance, retention

Each clause should be checkable. If a clause cannot be checked at inspection, it is a preference, not a requirement.

3. Board and finish

Name the board grade and thickness, and the finish system with sheen. A specification that says melamine without a sheen can receive gloss when matte was intended. The carcass materials guide and the door finishes guide cover the options.

4. Hardware

Name a brand or an approved equal with published cycle and load ratings. That keeps competition in the tender without losing the performance requirement. The hardware specification guide lists the six fields to include.

5. Doors and benchtop

Specify door style, thickness and edge banding; benchtop material, thickness and edge profile. These are the visible items and the ones most often substituted, so name them precisely.

6. Compliance and packing

Name the standards, the certificates and the labelling requirement. For packing, name the carton spec, the moisture barrier and the label content. A specification that stops at the product and ignores the pack will still produce damage claims.

7. Inspection and payment

State the inspection scope, timing and acceptance criteria, and the payment schedule with retention. The inspection clause is what turns the rest of the document from a wish list into a requirement.

8. Using the template

Copy the ten clauses into a one-page document, fill each with a measurable requirement, and attach it to the RFQ. Ask each factory to confirm compliance line by line, not with a single yes. That response is what makes the quotes comparable.

9. A checklist before you commit

Before you sign, confirm six things: the board grade, the hardware model, the finish system, the packing standard, the inspection scope and the payment schedule. Each should be in writing, not in a call. The quote checklist turns the six into a one-page comparison.

10. Common mistakes

The most common mistake is comparing a factory price with a landed cost. The second is leaving the inspection out of the budget. The third is paying the balance before the inspection is signed off. Each is avoidable with a written scope and a pre-shipment inspection.

11. How to measure the room

Measure each wall at three points, top, middle and bottom, and use the smallest. Walls are rarely square, and a 10 mm bow over three metres changes the filler. Measure the ceiling at each corner and note sockets, radiators and soil pipes before drawing. A measured survey saves more time than a faster drawing, and the measuring guide has a printable sheet.

Need a specification for an apartment project?
Send us the unit mix and finish intent and we will return a one-page specification with ten checkable clauses.
Request a specification

Frequently asked questions

Why write a specification before the quote?

Because the quote is only comparable if the specification is fixed. Without it, two factories quote different boards, hardware and finishes and the prices cannot be compared.

How long should it be?

One page is enough for most apartment projects. Ten clauses, each with a measurable requirement, beat a 20-page document nobody reads.

What board grade should I specify?

CARB P2 or E0 for general use, HMR in wet areas. Name the grade, not just the standard, because a certificate can name the factory without naming the board.

Should I name a hardware brand?

Name a brand or an approved equal with published ratings. That keeps competition in the tender without losing the performance requirement.

Who writes the specification?

Usually the project manager or the buyer, with input from the installer. The factory can comment, but should not write it, because the specification is the buyer requirement.

How does the specification link to inspection?

Every clause should be checkable at inspection. If a clause cannot be checked, it is a preference, not a requirement.

BFP
BFP Project Team
Cabinetry manufacturing & export · since 2016

This guide is based on live project files: specification reviews, pre-shipment inspection reports and clearance documents from apartment, townhouse and villa work. Where a figure varies by project we give the range rather than a single number. Standards and duty treatment should be confirmed against the current version and your own customs broker.

  Send floor plans and unit count — drawings and per-unit price back within 24 hours.
On this page
Get a project proposal
Send your floor plans and unit count — we reply with shop drawings and a per-unit quote.
Reply within 24 hours by email.
Key facts at a glance
ScopeKitchen, wardrobe, vanity, laundry
BoardCARB P2 / E0, HMR in wet areas
FinishLacquer or melamine
HardwareNamed brand or approved equal
BenchtopQuartz or laminate
PackingExport standard, labelled
Related Project Cases
All projects →
Product categories
All categories →


×

Contact Us

Full Name *
Business Email *
WhatsApp / Phone (Fast Response)
Project Type (Optional)
Estimated Units / Quantity (Optional)
Project Details / Message *

This website utilizes cookies.

We employ cookies to analyze website traffic and enhance your browsing experience. Data securely aggregated, privacy protected. See Privacy Policy for details.

I agree