6
Fields to specify
80k+
Hinge cycles, premium
30–50 kg
Runner load, premium
2
Brand or equal
1
Schedule per order
Short answer

A hardware specification needs six fields: hinge type and cycle rating, runner type and load, soft-close, brand or approved equal, finish and a schedule line per item. A schedule that lists only a brand is not a specification, because a brand covers several product lines and the factory can choose the cheapest.

Key takeaways
  • Six fields: hinge, runner, soft-close, brand, finish, schedule.

  • A brand alone is not a specification.

  • Require published cycle and load ratings.

  • Match the rating to the use, not the price.

  • Check model numbers at inspection.

1. Why specify hardware

Hardware is the part of the cabinet that moves, and the part most often substituted. A specification that names only a brand leaves the model to the factory, and the factory will choose the cheapest line that carries the brand. Six fields close that gap.

2. The six fields

#FieldWhat to state
1HingeType, cup size, cycle rating
2RunnerType, load rating, extension
3Soft-closeStandard on doors and drawers
4BrandNamed brand or approved equal
5FinishColour and plating
6ScheduleOne line per item with quantity

Each field should be checkable. If it cannot be checked at inspection, it is a preference, not a requirement.

3. Hinges

State the hinge type (full overlay, half overlay, inset), the cup size (usually 35 mm) and the cycle rating. The rating should be published by the maker. A 35 mm cup is standard, which keeps future replacement easy. The door styles guide covers how hinge choice changes with door weight.

4. Runners

State the runner type (ball-bearing, roller, undermount), the load rating and the extension (full or partial). Undermount runners look better and collect less dust, but cost more. Load rating should match the drawer use: 30–50 kg for pots, 20–30 kg for cutlery.

5. Soft-close and lift-ups

Soft-close should be standard on doors and drawers for residential work. For lift-ups, state the mechanism type and the door weight range, because a lift-up sized for a small door will not hold a large one. The Blum vs generic comparison covers the cost and life trade-off.

6. Brand or approved equal

Name a brand or an approved equal with published ratings. That keeps competition in the tender without losing the performance requirement. If you name a brand, name the model too, otherwise the brand becomes a ceiling rather than a floor.

7. The schedule

One line per item: description, model, quantity, location. A schedule that lists hardware as a lump sum cannot be checked or compared. Ask for it as a separate line in the quote, and attach it to the purchase order.

8. Checking at inspection

Check the model numbers on the schedule against the items fitted, and photograph the labels. Substitution is common and easy to miss, especially when the substitute looks similar. The hardware comparison explains what to look for.

9. A checklist before you commit

Before you sign, confirm six things: the board grade, the hardware model, the finish system, the packing standard, the inspection scope and the payment schedule. Each should be in writing, not in a call. The quote checklist turns the six into a one-page comparison.

10. Common mistakes

The most common mistake is comparing a factory price with a landed cost. The second is leaving the inspection out of the budget. The third is paying the balance before the inspection is signed off. Each is avoidable with a written scope and a pre-shipment inspection.

11. How to measure the room

Measure each wall at three points, top, middle and bottom, and use the smallest. Walls are rarely square, and a 10 mm bow over three metres changes the filler. Measure the ceiling at each corner and note sockets, radiators and soil pipes before drawing. A measured survey saves more time than a faster drawing, and the measuring guide has a printable sheet.

13. A specification checklist

Write four lines for every material: the product, the grade, the thickness and the surface or edge treatment. A material specified by name alone leaves the grade to the factory, and the grade is where the cost and the performance sit.

14. Questions the factory will ask

Expect four questions: which grade, which thickness, which edge and which batch. The answers should already be in the specification. If they are not, the factory will choose, and the choice will be the cheapest that meets the drawing.

Need a hardware schedule you can compare?
Send us the cabinet list and we will return a six-field hardware specification with cycle and load ratings.
Request a hardware schedule

Frequently asked questions

What should a hardware specification include?

Six fields: hinge type and cycle rating, runner type and load, soft-close, brand or approved equal, finish and a schedule line for each item.

Is naming a brand enough?

No. A brand can cover several product lines. Name the model or the performance requirement, otherwise the factory can choose the cheapest line within the brand.

What cycle rating should I require?

80,000 cycles or more for high-use kitchens, 50,000 for standard residential. The rating should be published, not implied.

What runner load should I require?

30–50 kg for pots and pans, 20–30 kg for lighter drawers. Match the rating to the use, not to the price.

Should soft-close be standard?

On most residential projects, yes. It reduces noise and door damage, and the cost is small against the cabinet.

How do I check the hardware at inspection?

Check the model numbers on the schedule against the items fitted, and photograph the labels. Substitution is common and easy to miss.

BFP
BFP Project Team
Cabinetry manufacturing & export · since 2016

This guide is based on live project files: specification reviews, pre-shipment inspection reports and clearance documents from apartment, townhouse and villa work. Where a figure varies by project we give the range rather than a single number. Standards and duty treatment should be confirmed against the current version and your own customs broker.

  Send floor plans and unit count — drawings and per-unit price back within 24 hours.
On this page
Get a project proposal
Send your floor plans and unit count — we reply with shop drawings and a per-unit quote.
Reply within 24 hours by email.
Key facts at a glance
HingeType, cup size, cycle rating
RunnerType, load, extension
Soft-closeStandard or optional
BrandNamed or approved equal
FinishColour and plating
ScheduleOne line per item
Related Project Cases
All projects →
Product categories
All categories →


×

Contact Us

Full Name *
Business Email *
WhatsApp / Phone (Fast Response)
Project Type (Optional)
Estimated Units / Quantity (Optional)
Project Details / Message *

This website utilizes cookies.

We employ cookies to analyze website traffic and enhance your browsing experience. Data securely aggregated, privacy protected. See Privacy Policy for details.

I agree