RTA is a shipping decision, not a quality level. The panels, hardware and doors can be identical to an assembled cabinet; what changes is who builds the box and where. RTA puts 40–60% more units in a container and moves assembly to site, at about 25–40 carcasses per crew-day.
RTA ships flat and assembles on site or locally.
Quality depends on the assembler, not the format.
40–60% more units per container.
25–40 carcasses per crew-day.
Best on long routes and tight storage.
1. What RTA is
RTA stands for ready to assemble. The cabinet ships as flat panels with cam-and-dowel or confirmat fittings, plus doors, drawers and hardware. It is assembled on site or in a local workshop. The box is the same design as an assembled cabinet; only the joint and the shipping state differ.
2. What ships and how it goes together
| Component | Format | Note |
|---|---|---|
| Carcass panels | Flat, edged | Cam-and-dowel or confirmat |
| Back panel | Flat or rolled | Slotted or stapled |
| Doors | Finished | Hinges fitted or loose |
| Drawers | Flat or assembled | Runners fitted or loose |
| Hardware | Bagged | Per-cabinet pack |
The assembly sequence matters: carcass first, then back panel, then drawers and doors. A crew that follows the sequence assembles faster and with fewer squareness problems.
3. Assembly time
About 25–40 carcasses per two-person crew per day, before doors and adjustment. A single kitchen is two to three hours for the carcasses. The time depends on the joint, the squareness of the panels and the crew experience.
4. Quality
RTA quality depends on the assembler. A well-assembled RTA box is as square as an assembled one; a poorly assembled one is not. If the installer is not your team, the quality standard is not yours either. The RTA vs assembled comparison covers the trade-off.
5. Container economics
RTA puts 40–60% more units in a container, which lowers freight per unit. It is a volume saving, not a cost saving: the assembly labour moves to site, and site labour is usually the more expensive line. The flat pack vs assembled guide covers the freight maths.
6. When RTA wins
RTA wins on long routes, tight storage and projects where you control an assembly crew. It also wins where the site has no laydown area for assembled boxes. City apartments often fit this profile.
7. When assembled wins
Assembled wins when the programme is short, site labour is expensive or unavailable, and the container is not the constraint. A hotel opening date usually favours assembled, because the install window is shorter.
8. Ordering RTA
Order by cabinet, not by panel. A packing list per cabinet, with hardware bagged per unit, saves more site time than a cheaper freight rate. The wholesale guide covers container planning.
9. A checklist before you commit
Before you sign, confirm six things: the board grade, the hardware model, the finish system, the packing standard, the inspection scope and the payment schedule. Each should be in writing, not in a call. The quote checklist turns the six into a one-page comparison.
10. Common mistakes
The most common mistake is comparing a factory price with a landed cost. The second is leaving the inspection out of the budget. The third is paying the balance before the inspection is signed off. Each is avoidable with a written scope and a pre-shipment inspection.
11. How to measure the room
Measure each wall at three points, top, middle and bottom, and use the smallest. Walls are rarely square, and a 10 mm bow over three metres changes the filler. Measure the ceiling at each corner and note sockets, radiators and soil pipes before drawing. A measured survey saves more time than a faster drawing, and the measuring guide has a printable sheet.
13. A specification checklist
Write four lines for every material: the product, the grade, the thickness and the surface or edge treatment. A material specified by name alone leaves the grade to the factory, and the grade is where the cost and the performance sit.
14. Questions the factory will ask
Expect four questions: which grade, which thickness, which edge and which batch. The answers should already be in the specification. If they are not, the factory will choose, and the choice will be the cheapest that meets the drawing.
Frequently asked questions
What does RTA mean?
Ready to assemble: the cabinet ships flat, with panels, hardware and doors, and is assembled on site or in a local workshop.
Is RTA lower quality than assembled?
Not inherently. The panels and hardware can be identical. The difference is who assembles the box and how well.
How long does assembly take?
About 25–40 carcasses per two-person crew per day. A single kitchen is two to three hours for the carcasses.
How much container space does RTA save?
40–60% more units per container, depending on size and packing. It is a volume saving, not a cost saving.
What hardware does RTA use?
Cam-and-dowel or confirmat joints, which can be assembled with a drill and a screwdriver. Glued carcasses are not RTA.
When should I choose RTA?
On long routes, tight storage and projects where you control an assembly crew. Assembled wins when the programme is short and site labour is expensive.














