$3,500–5,500
Per unit, mid-spec
18 mm
Carcass board
CARB P2
Board grade equivalent
16
Weeks door to door
60
Units in a benchmark set
Short answer

For a one-bed apartment kitchen at mid specification, the 2027 benchmark is about $3,500–5,500 per unit for cabinets only, excluding benchtop, appliances and installation. The range is wide because specification moves cost more than size. Use it to test whether a quote is plausible, not to replace one.

Key takeaways
  • $3,500–5,500 per unit, mid-spec, cabinets only.

  • Specification moves cost more than size.

  • Excludes benchtop, appliances and installation.

  • Compliance is included in the range.

  • Use it to test a quote, not to replace one.

1. What the benchmark is

A benchmark is a reference point for a budget. It is built from a representative unit type, a defined specification and current costs. It is not a quote, and it should be replaced by one as soon as the design is fixed.

2. Unit and specification

ItemBenchmarkNote
Unit type1-bed apartmentKitchen only
Carcass18 mm, E0/E1HMR in wet areas
HardwareSoft-close, 50k+Named or equal
DoorsSlab or shakerMid-range finish
Cost$3,500–5,500Cabinets only

The specification is deliberately mid-range. A premium door or a stone benchtop moves the number well outside the range.

3. What moves the cost

Door style, hardware brand, finish and order size move the cost more than the unit size. A shaker door with a premium hinge can add 20–30% to a slab door with a standard hinge. A 20-unit order can cost 20–30% more per unit than a 60-unit order, because setup spreads less.

4. What is excluded

Benchtop, appliances, installation, plumbing and electrical are excluded. Each is a separate line, and together they can exceed the cabinet cost. The landed cost guide shows how to add them.

5. Compliance

The benchmark assumes a compliant board and the standard documents: AS/NZS declaration, board report, labels and packing. Compliance adds a small amount per unit, but it is real and it is included in the range. The compliance guide lists the documents.

6. Lead time

The benchmark assumes a 16-week door-to-door schedule. A compressed schedule costs more, either through a production premium or through air freight. The lead time guide covers the schedule.

7. Using the benchmark

Test a quote against the range. A number far below usually means a scope gap; a number far above usually means a premium specification or a small order. Neither is wrong, but both should be explained.

8. Updating the benchmark

Update it annually with current factory, freight and duty inputs. A benchmark that is two years old is a guess. The Australia sourcing guide covers the route inputs.

9. A checklist before you commit

Before you sign, confirm six things: the board grade, the hardware model, the finish system, the packing standard, the inspection scope and the payment schedule. Each should be in writing, not in a call. The quote checklist turns the six into a one-page comparison.

10. Common mistakes

The most common mistake is comparing a factory price with a landed cost. The second is leaving the inspection out of the budget. The third is paying the balance before the inspection is signed off. Each is avoidable with a written scope and a pre-shipment inspection.

11. How to measure the room

Measure each wall at three points, top, middle and bottom, and use the smallest. Walls are rarely square, and a 10 mm bow over three metres changes the filler. Measure the ceiling at each corner and note sockets, radiators and soil pipes before drawing. A measured survey saves more time than a faster drawing, and the measuring guide has a printable sheet.

13. A specification checklist

Write four lines for every material: the product, the grade, the thickness and the surface or edge treatment. A material specified by name alone leaves the grade to the factory, and the grade is where the cost and the performance sit.

14. Questions the factory will ask

Expect four questions: which grade, which thickness, which edge and which batch. The answers should already be in the specification. If they are not, the factory will choose, and the choice will be the cheapest that meets the drawing.

Testing a quote against the benchmark?
Send us the unit mix and specification and we will show where the quote sits against the 2027 range.

Frequently asked questions

What does the benchmark cover?

A one-bed apartment kitchen at mid specification: cabinets only, excluding benchtop, appliances and installation. It is a budget test, not a quote.

Why a range rather than a number?

Because specification moves the cost more than size. Door style, hardware and finish can move the unit cost by 30–40%.

Is the benchmark for 2027?

It is a forward-looking benchmark based on current costs and expected input inflation. Treat it as a planning figure and update it with a quote.

Does it include compliance?

It assumes a compliant board and the standard documents. Compliance cost is small per unit but real, and it is included in the range.

Does it include installation?

No. Installation is a separate line, typically 10–18% of the cabinet cost.

How should I use it?

Test a quote against it. A number far below the range usually means a scope gap; a number far above usually means a premium specification or a small order.

BFP
BFP Project Team
Cabinetry manufacturing & export · since 2016

This guide is based on live project files: specification reviews, pre-shipment inspection reports and clearance documents from apartment, townhouse and villa work. Where a figure varies by project we give the range rather than a single number. Standards and duty treatment should be confirmed against the current version and your own customs broker.

  Send floor plans and unit count — drawings and per-unit price back within 24 hours.
Get a project proposal
Send your floor plans and unit count — we reply with shop drawings and a per-unit quote.
Reply within 24 hours by email.
Key facts at a glance
Unit typeOne-bed apartment kitchen
Cost$3,500–5,500 per unit, mid-spec
Board18 mm, E0/E1, HMR wet areas
HardwareSoft-close, 50k+ cycles
Lead time16 weeks door to door
ComplianceAS/NZS, board report, ISPM 15
Related Project Cases
All projects →
Product categories
All categories →


×

Contact Us

Full Name *
Business Email *
WhatsApp / Phone (Fast Response)
Project Type (Optional)
Estimated Units / Quantity (Optional)
Project Details / Message *

This website utilizes cookies.

We employ cookies to analyze website traffic and enhance your browsing experience. Data securely aggregated, privacy protected. See Privacy Policy for details.

I agree