Respuesta corta

Pre ensamblado if your programme is tight, your site labour is expensive or unavailable, or you need the box to arrive square. RTA if freight and STORAGE dominate your cost and you control the assembly crew. The tipping point is usually around 30 units on a long sea route — below that, the freight saving rarely covers the site labour.

Puntos clave
  • Flat-packing puts 40–60% more cabinetry in the same container. That is a volume saving, not a 40–60% cost saving — freight is one line of the landed cost.

  • RTA is only as square as the person who assembles it. If the installer is not your team, the quality standard is not yours either.

  • Cam-and-dowel and confirmat joints can be dismantled later. A glued factory cuerpo cannot — that matters for alterations and for re-use.

  • Site assembly runs at roughly 25–40 carcasses per two-person crew per day, before doors and adjustment.

  • On projects under about 30 units, pre-assembled usually wins once you count the snagging time RTA creates.

1. What actually changes

It is not the cabinet. Board, hardware, acabado and door profile can be identical. What changes is who builds the box, when, and how much air you pay to ship.

The joint is the technical fork. RTA boxes use cam-and-dowel or confirmat so they can be assembled with a drill and a screwdriver. Pre-assembled boxes are usually glued and clamped in the factory, which is stronger and permanently square — and impossible to take apart.

The five things that differ
PropiedadRTAPre ensamblado
Volumen de envíoMás bajo30–60% más alto
Mano de obra en la obraMontaje completoPosition and fix
ConjuntoCam-and-dowel or confirmatGlued dowel, clamped
CuadraturaAs good as the assemblerSet in the factory
Alteración posteriorSe puede desmontarFijo

2. The freight maths, honestly

A 40 ft high-cube holds roughly 55–65 m³. Flat-packed cabinetry uses that volume at maybe 85% efficiency; assembled boxes waste 30–50% of it in the voids around them. That is where the 40–60% figure comes from.

But freight is not the whole landed cost. A typical import sits at roughly 1.35–1.6× FOB once freight, duty, clearance and delivery are counted, and the freight share of that varies enormously with route. On a short route with cheap containers, the saving can be swallowed by site labour. On a long route, it is the difference between winning and losing the job.

Container fill: same kitchen, two states
ParámetroEmpaquetado planoPre ensamblado
40 ft high-cube volume≈65 m³≈65 m³
Usable volume after packing≈55 m³≈38–45 m³
Unidades por contenedorBaseEntre un 30 y un 50 % menos
Costo de flete por unidadMás BajoMás alto
Storage before installCompactNeeds floor area

3. Site labour and the programme

A two-person crew will build 25–40 carcasses a day, and that is before doors, cajóns, adjustment and cleaning. On a 200-unit apartment job, that is five to eight working days of pure assembly — plus the defects that only appear after assembly.

Pre-assembled units turn that into positioning: unpack, set, fix, level. The labour does not disappear, it moves to a factory where it is cheaper and repeatable, and it leaves the site programme for trades that cannot be moved off site.

If the programme has float, RTA is fine. If the handover date is fixed and the trades are stacked, it is a risk you are taking on behalf of the client.

Need a landed-cost comparison for your unit count?
Send the unit count and destination port — we will price both shipping states side by side.

4. Who squares the box

This is the argument that decides most projects, and it is rarely written down. A glued carcass leaves the factory square because it was clamped square. An RTA carcass is square if the assembler checked the diagonal — and most do not, because the drawing does not ask them to.

The failure shows up months later as a door gap at one corner, a drawer that binds, or a run that will not close against a wall. It is fixable, but only by someone with authority on site, and by then the unit is full of somebody else’s kitchen.

Where the quality risk sits
SupervisiónRTAPre ensamblado
Box square on arrivalNoSí:
Calidad de montajeSite crew dependentControlado de fábrica
Daños de tránsitoDaños en el bordeDaños en las esquinas y en la cara
Snagging after installMás altoMás Bajo
Costo de retrabajoSite labour ratesFactory, before shipping

5. How to specify either one

For RTA, specify packing, not just product: panels numbered to a part list, fittings bagged by cabinet rather than by type, and a carton label carrying unit reference, room and elevation. A mixed bag of cams across forty cabinets costs more in labour than the freight saved.

For pre-assembled, specify the assembly state explicitly — carcass glued and squared, fronts separate, fittings bagged per unit — and inspect the diagonal before packing. Three units per pallet, not one per shipment.

Preguntas frecuentes

Is RTA cheaper than pre-assembled?

Usually 8–15% cheaper at the same specification, before freight. Once freight is added the gap widens on long routes and narrows on short ones.

How much container space does flat-packing save?

Roughly 40–60% more units per container, depending on unit sizes and how well the cartons are packed.

Can pre-assembled cabinets be adjusted on site?

They can be positioned and levelled, but the box cannot be re-squared once the glue has cured. Any twist has to be caught before packing.

Which is better for a remote site?

Pre-assembled, unless you are sending your own assembly crew. RTA assumes skilled labour that remote sites often do not have.

Do RTA cabinets look different once installed?

No. The visible cabinet is identical. The difference is inside the joint and behind the back panel.

BFP
Equipo del proyecto BFP
Fabricación y exportación de muebles de cocina · desde 2016

Esta guía se basa en archivos de proyectos reales: revisiones de especificaciones, informes de inspección previa al envío y documentos de despacho de aduanas de apartamentos, casas adosadas y villas. Cuando una cifra varía según el proyecto, indicamos el rango en lugar de un número único. Las normas y el tratamiento arancelario deben confirmarse con la versión vigente y con su agente de aduanas.

  Envíe los planos de planta, el número de unidades, los dibujos y el precio por unidad en un plazo de 24 horas.
Obtenga una propuesta de proyecto
Envíenos sus planos y el número de unidades; le responderemos con planos de taller y un presupuesto por unidad.
Responda por correo electrónico en un plazo de 24 horas.
Datos clave de un vistazo
EntregasRTA: 40–60% more units per container
Mano de obra en la obra25–40 carcasses per crew per day
ConjuntoCam-and-dowel (RTA) vs glued (assembled)
El plazo de ejecución30–45 days production, either state
Ideal paraRTA: long routes, own crew
Casos de proyectos relacionados
Todos los proyectos →
Categorías de productos
Todas las categorías →


×

Contáctenos

* Nombre completo
Email de negocios *
WhatsApp / Teléfono (Respuesta rápida)
Tipo de proyecto (opcional)
Unidades/Cantidad estimadas (opcional)
Detalles del proyecto / Mensaje *

Este sitio web utiliza cookies.

Utilizamos cookies para analizar el tráfico del sitio web y mejorar tu experiencia de navegación. Datos agregados de forma segura y privacidad protegida. Consulta la Política de Privacidad para más detalles.

Estoy de acuerdo