55-65%
Factory price share
8-12%
Fletes y seguros
5-25%
Duty and tariff
30%
Depósito típico
16
Weeks to cash cycle
Respuesta corta

Landed cost is the only number that can be compared across routes. On most projects the factory price is 55–65% of it; freight, duty, clearance and installation make up the rest. A quote that compares factory prices across countries is comparing the smallest variable. Convert every quote to landed cost at the same specification, incoterm and installation scope before deciding.

Puntos clave
  • Factory price is 55–65% of landed cost on most routes.

  • Freight is 8–12%, duty 5–25%, clearance 5–8%, installation 10–18%.

  • Compare per unit at the same incoterm and scope, never per container.

  • 30% deposit and balance before loading is normal; hold a retention against inspection.

  • Financing cost belongs in the model, not outside it.

1. What landed cost includes

Landed cost has seven lines: factory price, freight, insurance, duty, clearance, delivery and installation. Each behaves differently. The factory price scales with specification; freight scales with volume and route; duty scales with value and origin; installation scales with site conditions. A model that treats them as one number cannot answer the question that matters: which route is cheaper for this project.

2. The factory price line

The factory price is the easiest line to quote and the easiest to misread. It usually excludes packaging upgrades, hardware brand upgrades and testing. Ask what is included before comparing. A price that excludes Blum hardware or export packing is not comparable with one that includes them.

Order size changes the unit price because setup and tooling are fixed. Above about 30 units the curve flattens; below 10 units the fixed costs dominate. The Guía de MOQ explains where the breakpoints usually sit.

3. Freight and insurance

Freight is 8–12% of landed cost on most routes, but it varies more than that between routes. A 40 ft high-cube to the US West Coast is not priced like one to Jeddah, and a flat-pack container carries 40–60% more units than an assembled one. Insurance is small but should be explicit, because a claim without cover is a write-off.

4. Duty, VAT and tariff exposure

MarketDeberNota:
Estados Unidos 25%Section 301 on Chinese cabinets
Reino Unido0-5%Plus 20% VAT, usually recoverable
Canada0-20%Anti-dumping can change the rate
Australia / NZ0-5%Plus GST, usually recoverable
GCC5%Plus VAT where applicable

The duty line is where quotes most often mislead. A factory quote is usually ex-works or FOB, so duty is not in it. Add it before comparing.

5. Clearance, delivery and installation

Clearance and delivery run 5–8% of landed cost, and installation 10–18%. Both are site-dependent. A city apartment with no laydown area costs more to deliver and install than a suburban house. Installation scope also varies: some quotes include doors and adjustment, some stop at carcasses. Compare the scope, not just the number.

6. Payment terms and cash flow

30% deposit and the balance before loading is the common structure. That means cash leaves your account about ten weeks before the container arrives. Model the financing cost at your cost of capital; on a 16-week cycle it is a real line. Hold a retention until the inspección de pre-envío is signed off, and never pay the balance on a photo.

7. A per-unit model

LinePor unidadCompartir
Precio de fábrica$2,80062%
Fletes y seguros$45010%
Deber$70016%
Despacho y entrega$2806%
Instalación$2706%
Coste de aterrizaje$4,500100%

The numbers are illustrative, but the proportions are typical for a mid-spec apartment kitchen on a 25% duty route. Change the duty to 5% and the factory share rises to about 70%.

8. Comparing two quotes

Convert both quotes to landed cost at the same specification, incoterm and installation scope. Then compare per unit. A lower factory price can lose on duty, freight or scope. The guía de plazos de entrega covers the schedule side, because a cheaper route that arrives two weeks late is not cheaper.

9. Una lista de verificación antes de comprometerse.

Antes de firmar, confirme seis puntos: la calidad de la placa, el modelo de hardware, el sistema de acabado, el estándar de embalaje, el alcance de la inspección y el calendario de pagos. Todos deben constar por escrito, no por teléfono. La lista de verificación del presupuesto resume estos seis puntos en una comparación de una página.

10. Errores comunes

El error más común es comparar el precio de fábrica con el costo de entrega. El segundo es no incluir la inspección en el presupuesto. El tercero es pagar el saldo antes de que se apruebe la inspección. Todos estos errores se pueden evitar con un alcance del proyecto por escrito y una inspección previa al envío.

Comparing quotes across routes?
Send us two quotes and the project brief and we will convert both to a like-for-like landed cost per unit.

Preguntas frecuentes

¿Qué es el costo de descarga?

Landed cost is the total cost of getting a cabinet to site: factory price, freight, insurance, duty, clearance, delivery and installation. It is the only number that can be compared across routes.

Why is the factory price only two-thirds?

Because freight, duty, clearance and installation add 35–45% on most routes. A quote that compares factory prices across countries is comparing the smallest variable.

¿Cómo puedo comparar dos presupuestos de forma justa?

Convert both to landed cost at the same specification, incoterm and installation scope. Then compare per unit, not per container. A lower factory price can lose on duty or freight.

¿Cuáles son las condiciones de pago habituales?

30% deposit and the balance before loading is common. Some factories accept a retention against inspection. Never pay the balance before the pre-shipment inspection is signed off.

Does order size change the unit cost?

Yes. Setup, tooling and freight fixed costs spread over more units. Above about 30 units the curve flattens; below 10 units the fixed costs dominate.

How do I include financing cost?

Model the cash tied up from deposit to installation, at your cost of capital, and add it to the landed cost. On a 16-week cycle it is a real line, not a rounding error.

BFP
Equipo del proyecto BFP
Fabricación y exportación de muebles de cocina · desde 2016

Esta guía se basa en archivos de proyectos reales: revisiones de especificaciones, informes de inspección previa al envío y documentos de despacho de aduanas de apartamentos, casas adosadas y villas. Cuando una cifra varía según el proyecto, indicamos el rango en lugar de un número único. Las normas y el tratamiento arancelario deben confirmarse con la versión vigente y con su agente de aduanas.

  Envíe los planos de planta, el número de unidades, los dibujos y el precio por unidad en un plazo de 24 horas.
Casos de proyectos relacionados
Todos los proyectos →
Categorías de productos
Todas las categorías →


×

Contáctenos

* Nombre completo
Email de negocios *
WhatsApp / Teléfono (Respuesta rápida)
Tipo de proyecto (opcional)
Unidades/Cantidad estimadas (opcional)
Detalles del proyecto / Mensaje *

Este sitio web utiliza cookies.

Utilizamos cookies para analizar el tráfico del sitio web y mejorar tu experiencia de navegación. Datos agregados de forma segura y privacidad protegida. Consulta la Política de Privacidad para más detalles.

Estoy de acuerdo