NZ projects buy from China on FOB terms and clear through Auckland or Tauranga in 18–22 days. The step that catches buyers out is biosecurity, not customs: MPI checks timber packaging and solid wood components, and non-compliant packaging can be treated, re-exported or destroyed. Confirm ISPM 15 compliance before the container is packed.

Puntos clave
  • AS/NZS 4386 is the relevant unit standard; E0 or E1 board is common.

  • MPI biosecurity checks timber packaging; ISPM 15 compliance is not optional.

  • GST at import is 15%, usually recoverable but a cash-flow item.

  • Transit is 18–22 days to Auckland or Tauranga; inland distance decides the port.

  • Packaging queries, not duty, cause most NZ delays.

1. What NZ buyers actually verify

NZ buyers verify the unit standard, board grade and packaging compliance. AS/NZS 4386 is the reference for units; E0 or E1 board is common; and MPI biosecurity is the gate that decides whether the container moves. A factory that has shipped to Australia usually understands the last point, because the rules are similar.

2. Four sourcing routes compared

RutaLo que comprasEl plazo de ejecuciónIdeal para
Direct factory FOBCustom cabinets to your spec16 semanasTownhouse and apartment projects
NZ importer stockStandard sizes from a local warehouse2-4 semanasSmall jobs and fill-ins
distribuidor localBranded cabinets, installed6-8 semanasSingle dwellings and retail
HíbridoFactory boxes, local fronts12-14 semanasDesign-led projects

Direct FOB is cheapest per unit above about 25 units, but it puts biosecurity and packaging compliance on you.

3. Five documents to request before deposit

  • Board emission report and board supplier name

  • ISPM 15 mark on timber packaging, or a declaration that no solid wood is used

  • Hardware specification with model numbers

  • Shop drawing sample for one typical unit

  • Pre-shipment inspection scope and checklist

The packaging declaration is the one to get in writing. A verbal assurance is not enough when MPI is holding the container.

4. Where the money goes per unit

Línea de costosParticipación en el costo de desembarque
Precio de fábrica58-68%
Fletes y seguros8-12%
Deber0-5%
Despacho y entrega5-8%
Instalación12-18%

GST sits outside the table because it is usually recoverable. The line that surprises buyers is biosecurity treatment, which can add cost and a week.

5. Shipping and clearance into NZ

Cerca del puerto deportivoIdeal paraTransit
AucklandIsla Norte superior18 – 22 días
TaurangaWaikato, Bay of Plenty18 – 22 días
LytteltonIsla del Sur20 – 24 días

MPI clearance is usually one to three days for a clean container. A packaging query can add a week and may require treatment. Keep the ISPM 15 evidence with the shipping documents.

6. Installation and defect management

NZ installation is usually subcontracted and sites are smaller than in Australia or the US. Stage deliveries to match the build, because storage is limited. Photograph damaged cartons before opening, and keep a spares pack per unit type for later replacement.

7. Vetting a factory in 12 checks

  1. Business and export licence

  2. Board emission report

  3. ISPM 15 packaging evidence

  4. Hardware brand authorisation

  5. Shop drawing capability

  6. Edge banding line

  7. Embalaje estándar

  8. Fotos de carga de contenedores

  9. NZ or AU shipment references

  10. Historial de inspección

  11. Lead time record

  12. Respuesta posventa

8. A schedule that holds

SemanaMilestone
1-2Drawings, approval, deposit
3-9Production and in-line checks
10Inspección de pre-envío
11Loading and export clearance
12-14Sea freight to NZ port
15MPI and customs clearance
16Installation and snagging

The schedule is tight but workable. The risk sits in week 11, when packaging is inspected, not in production.

9. Common mistakes on a first shipment

Three mistakes show up on almost every first shipment. The first is a certificate that names the factory but not the board grade. The second is a quote that leaves out GST and any biosecurity treatment. The third is a drawing approved after production starts, which moves every later date. Each is cheap to prevent and expensive to fix.

10. What to put in the purchase order

The purchase order should state the board grade, hardware model, door finish, packing standard and inspection scope. It should also name the Incoterm, the port and the party responsible for AS/NZS compliance. A PO that lists only sizes and colours leaves the important terms to interpretation. Attach the especificación de hardware y conectar Norma de embalaje as annexes.

11. Lead time and cash

Most factories ask for 30% deposit and the balance before loading. That means cash leaves your account roughly ten weeks before the container arrives. Model the working capital, not just the unit price, and hold back a retention until the inspección de pre-envío is signed off. The guía de costos de desembarque shows how to include the financing cost.

12. A worked example

Take a 60-unit apartment kitchen with a cabinet value of about $180,000 FOB. Freight adds 8–12%, GST and any biosecurity treatment adds its share, and installation adds 10–18% of the installed cost. The factory price is roughly two-thirds of the landed total; everything else is the route. Two ports can move the same cabinet by several hundred dollars per unit, which is why the route decision should come before the factory negotiation. Run the numbers in the guía de costos de desembarque before asking for a second factory quote.

Planning an NZ project and comparing routes?
Send us the unit count, port and specification and we will model landed cost with GST and biosecurity requirements.

Preguntas frecuentes

What standard applies to cabinets in New Zealand?

AS/NZS 4386 is the relevant unit standard, and board is usually specified as E0 or E1. Ask for a test report naming the board grade and confirm the standard the project specifies.

Why does biosecurity matter for cabinets?

MPI checks timber packaging and any solid wood components for pests. Non-compliant packaging can be treated, re-exported or destroyed at the importer cost, so ISPM 15 compliance is not optional.

Is ISPM 15 required for flat-pack cabinets?

It applies to solid wood packaging and dunnage, not to processed board. If the crate or pallet uses timber, it needs the ISPM 15 mark. Confirm with the factory before packing.

How much GST do I pay?

GST is 15% on the customs value plus duty and freight. It is usually recoverable if you are GST-registered, but it affects cash flow at import.

¿Qué puerto debo utilizar?

Auckland for the upper North Island, Tauranga for Waikato and Bay of Plenty, Lyttelton for the South Island. Transit is similar, so inland distance decides.

How long does MPI clearance take?

A clean container is usually cleared in one to three days. A packaging query can add a week and may require treatment or re-export.

BFP
Equipo del proyecto BFP
Fabricación y exportación de muebles de cocina · desde 2016

Esta guía se basa en archivos de proyectos reales: revisiones de especificaciones, informes de inspección previa al envío y documentos de despacho de aduanas de apartamentos, casas adosadas y villas. Cuando una cifra varía según el proyecto, indicamos el rango en lugar de un número único. Las normas y el tratamiento arancelario deben confirmarse con la versión vigente y con su agente de aduanas.

  Envíe los planos de planta, el número de unidades, los dibujos y el precio por unidad en un plazo de 24 horas.
Obtenga una propuesta de proyecto
Envíenos sus planos y el número de unidades; le responderemos con planos de taller y un presupuesto por unidad.
Responda por correo electrónico en un plazo de 24 horas.
Datos clave de un vistazo
MarketNZ residential, townhouse, hospitality
CumplimientoAS/NZS 4386, E0/E1 board
BioseguridadMPI, ISPM 15 timber packaging
enrutamiento18–22 days to Auckland or Tauranga
PuertosAuckland, Tauranga, Lyttelton
El plazo de ejecución30–45 days production, 16 weeks door to door
Casos de proyectos relacionados
Todos los proyectos →
Categorías de productos
Todas las categorías →


×

Contáctenos

* Nombre completo
Email de negocios *
WhatsApp / Teléfono (Respuesta rápida)
Tipo de proyecto (opcional)
Unidades/Cantidad estimadas (opcional)
Detalles del proyecto / Mensaje *

Este sitio web utiliza cookies.

Utilizamos cookies para analizar el tráfico del sitio web y mejorar tu experiencia de navegación. Datos agregados de forma segura y privacidad protegida. Consulta la Política de Privacidad para más detalles.

Estoy de acuerdo